Library! - Click for Home
 
HOW DO I 
SEARCH


Facebook  Twitter

 


Collister Photo Gallery - Construction - Boise Public Library
Collister Construction Photo Gallery

Facts about the LIBRARY! at Collister, plus floorplan

To see the captions, just mouse over the small pictures (thumbnails).  To see a picture full-size, just click on the thumbnail, and the larger photo will appear in the space below.

Collister Construction Photos - October

Collister Construction Photos - September

Collister Construction Photos - October

.

Standing at west wall, looking north.

The lighted area (behind column) is the children's space. The door at left is an emergency exit, which goes through the staff/support area to a back exit. The door on the adjacent wall goes into the AV-equipped meeting room (seats 40). On the top left wall, you can see part of the electrical system, and at top right, some of the HVAC (heating & cooling) ducts.

 

Collister Construction Photos - September

.

Library Director Kevin Booe & Project Manager Rob Bousfield review site plans.

 

 

 

Return to Library Facilities Planning Page

 

 

Last Updated:11/05/2007 Author:JMH

 
City of Boise Logo