Collister Construction Photo Gallery
Facts about the LIBRARY! at
Collister, plus floorplan
To see the captions, just mouse over the small pictures (thumbnails).
To see a picture full-size, just click on the thumbnail, and the larger photo
will appear in the space below.
Collister Construction Photos - October
Collister Construction Photos - September
Collister Construction Photos - October
Standing at west wall, looking north.
Standing at west wall, looking northeast.
Standing near front door, looking back (north).
From east wall, looking northwest.
The lighted area (behind column) is the children's space. The door at left is an emergency exit, which goes through the staff/support area to a back exit. The door on the adjacent wall goes into the AV-equipped meeting room (seats 40). On the top left wall, you can see part of the electrical system, and at top right, some of the HVAC (heating & cooling) ducts.
Here, you're standing at the same spot, but looking towards the northeast corner of the library. The long wall goes along the AV-equipped meeting rooms (seat 40 & 10, respectively). The door on the brightly-lit wall is the entrance to the larger meeting room (also seen in previous photo). On the long wall, the first door is the emergency exit from the large meeting room; the second is the entrance to the small meeting room; and the dark areas after that are the beginning of the hall area leading to the restrooms.
This shot also shows the front wall of the 2 meeting rooms (the entrance to the small meeting room is behind the pillar). The wide door on the right leads into the restroom area, and will also contain a drinking fountain. A copier and printer will be available at the far left. Most of the other space you see will be occupied by study tables, online catalog stations and shelving for library materials.
This shot was taken from the edge of the "living room" area on the east wall, looking towards the children's area (northwest corner, red ladder). Most of the intervening space will be filled with the library materials and study desks. The workmen are standing by the future circulation desk, which will be located in the cut-out between the two columns. Note the electrical conduits on the columns and support beams.
Standing at west wall, looking north.
The lighted area (behind column) is the children's space. The door at left is an emergency exit, which goes through the staff/support area to a back exit. The door on the adjacent wall goes into the AV-equipped meeting room (seats 40). On the top left wall, you can see part of the electrical system, and at top right, some of the HVAC (heating & cooling) ducts.
Collister Construction Photos - September
Library Director Kevin Booe & Project Manager Rob Bousfield review site plans.
Looking north into the future AV-equipped multipurpose room (will seat 40).
A closer look at the multipurpose room.
Now, we're inside the multipurpose room, looking out towards the west wall into the children's area.
This shot's from the future AV-equipped conference room next to the multipurpose room, looking east towards the printer/photo-copier area.
Looking south from the meeting room area towards the main part of the library.
Looking into the future electrical room. Note the overhead exposed duct. These will be also be exposed (but prettier) in the new library.
Looking north into the I.T./telephone room and into the staff workroom.
Dirt excavated for the new sewer line.
Library Director Kevin Booe & Project Manager Rob Bousfield review site plans.
Return to Library Facilities Planning Page
Last Updated:11/05/2007